Objectives
|
The main objectives of the project can broadly
be described as
- Enhancement of the
performance of ballasted tracks, hence reduction of maintenance,
by better understanding the geomechanical behaviour of elements
of the embankment and subgrade as well as the dynamic behaviour of
the complete embankment-ground-train system,
- Assessment of
performance of various track retrofitting methods for the selected
segments of two railway lines which have been subjected to excessive
deformation and settlement.
To achieve these
objectives the following activities are undertaken
-
Measurement
of track and ground responses at several problematic sites with
regards to settlement and maintenance
-
Characterisation
and modelling of the behaviour of soil and ballast using
large-size specimens
-
Laboratory
testing of track using a large-scale track-box facility
-
Advanced
numerical modelling of non-linear dynamic behaviour of embankment
and ground accounting for train-track interaction
-
Assessment
of traditional and innovative methods
of retrofitting track, embankment and sub-grade
|
|